Since 2000, we have permitted, designed, and done construction observation on five parking lots at the University of Maine. These lots ranged in size from 90 spaces to 360 spaces. Projects included developing surface and subsurface drainage systems for each lot and connecting these systems into the existing drainage system of the University. CES was also responsible for providing lighting designs to meet the University's requirements. One project included the construction of a detention pond and treatment system to control runoff quality and quantity.

Other responsibilities included providing an existing conditions survey, developing conceptual plans, reviewing conceptual plans with the University and selecting a design, permitting the project with the Maine Department of Environmental Protection, providing final design plans and specifications, putting the project out to bid, contractor selection, construction observation, and contract administration.

Hilltop Parking Lot Phase I
Hilltop Parking Lot Phase II
Hilltop Parking Lot Phase III
MCA Parking Lot
York Village Expansion Lot
Aroostook Parking Lot
Chicken House Parking Lot
University of Maine Parking Lots

Offices in Brewer, Machias, Bar Harbor, Auburn, Presque Isle
©2008 • CES, Inc. | Best if viewed at 1280 x 1024 resolution

site search by freefind advanced